Sunday, February 6, 2022

Mast base installation (1)

After a long hiatus due to several reasons, here we are again in the shop to invent a proper way to secure the mast base to the front aka. In this picture you see a temporary screw placed in the center of the aka. We then bored a hole through the whole thickness with a 12 mm bit, but the steel bar attached to the mast base has a diameter of 15 mm, but the bit we have is too short so we will need a longer 15 mm bit.

Total work time to date: 789 hours