Last night Cinzia filled the screw holes in the soles with resin. Today we started the FG taping of the soles, beginning with the forward one. We first prepared the surface for bonding with #50 grit sandpaper, and then cleaned everything with a vacuum cleaner and then a rag wetted with water and alcohol. We then prepared a putty with resin thickened with microspheres and some cabosil, which was spread along the sole/hull corner using a 5 cm diameter plastic ball to make a fillet. At the end, the 10 cm FG tape was put over the fillet. About 4 m of tape were used. Here's a pic
Total work time to date: 307 hours
Sunday, July 19, 2015
Saturday, July 11, 2015
Central sole glued
Two more hours and more than half a liter of thickened resin to glue the central sole. This is larger and heavier of the other two sole panels, mainly due to the daggerboard trunk glued to the underside. We made a rudimental crane to lower the panel down, which surprisingly enough worked properly. Here's a pic with the milestone beer.
Total work time to date: 304 hours
Total work time to date: 304 hours
Saturday, July 4, 2015
Rear sole glued
After an idle period of two weeks here we are again. Two hours today to glue the rear sole with the usual technique. We also swapped the two floats on the cradles, so we had to take the main hull out.
Here's a pic that shows the main hull in all its glory
and here is how it looks like from the second floor
Total work time to date: 302 hours
Here's a pic that shows the main hull in all its glory
and here is how it looks like from the second floor
Total work time to date: 302 hours
Wednesday, June 17, 2015
Forward sole glued
Two hours today (hitting the 300 hours of work!) to glue the forward sole panel in the main hull. We first prepared the panel preboring 3 mm holes for the screws, sanding and cleaning the gluing surface
We then prepared about 400 grams of thickened resin which was spread on the gluing lines, and then screwed everything down.
Next time we will remove the screws, make a round fillet and FG tape the sole/hull corner all around.
Total work time to date: 300 hours!
We then prepared about 400 grams of thickened resin which was spread on the gluing lines, and then screwed everything down.
Next time we will remove the screws, make a round fillet and FG tape the sole/hull corner all around.
Total work time to date: 300 hours!
Saturday, June 13, 2015
Ready to glue the sole
Four hours of work today. It's getting hotter here in southern Italy, so a new fridge is mandatory now.
We worked with rasp, Surform and sandpaper to fair and round the daggerboard trunk edges at the sole (to be fair Cinzia did most of the work). Here's how it looked before
and here it is, almost done
We the covered the edge with fiberglass tape and resin. Going around the corners is not easy, but we trust much in fairing with putty...
We also filled the screw holes in the rudder plank, and we sanded and cleaned all sole supports in the main hull in preparation for the sole glueing session.
Total work time to date: 298 hours
We worked with rasp, Surform and sandpaper to fair and round the daggerboard trunk edges at the sole (to be fair Cinzia did most of the work). Here's how it looked before
and here it is, almost done
We the covered the edge with fiberglass tape and resin. Going around the corners is not easy, but we trust much in fairing with putty...
We also filled the screw holes in the rudder plank, and we sanded and cleaned all sole supports in the main hull in preparation for the sole glueing session.
Total work time to date: 298 hours
Saturday, June 6, 2015
Cockpit sole, daggerboard trunk and rudder blade
Five hours of work today. We first cut to size the 3 sole stiffeners. Here's Cinzia sitting in the main hull and still smiling before being buried under the sole to check
Then, we glued the daggerboard trunk and the stiffeners to the low side of the sole, making epoxy fillets all around. This took quite a bit of measuring, checking, planing and the like.
We were so enthusiastic to work with epoxy that we decided to laminate the rudder blade (same thickness of the daggerboard)
Several clamps were used on the sole, so we had to use more sheetrock screws to squeeze everything together.The protruding part of the core layer will be cut flush when the resin sets.
Total work time to date: 294 hours
Total work time to date: 294 hours
Monday, June 1, 2015
Coating, and daggerboard
Today many (including us) took a day off since tomorrow is a holiday in Italy (Republic Day). We call this "ponte" (literally "bridge"). So we could work 4 hours at the boat.
First, we cut the centerboard hole in the centrale sole panel.
We also gave two coats of resin to the other two sole panels and to the daggerboard trunk
We then laminated the centerboard plank from 3 layers of plywood (15-6-15 mm) glued with thickened resin. We used sheetrock screws to squeeze the sandwich along the central line, and a liberal amount of clamps all around.
Total work time to date: 289 hours