Saturday, May 22, 2021

Painting the vaka deck and cockpit (3)

Three hours of work day. We gave one more coat of white enamel (Boero Altura TC one part polyurethane paint diluted about 10% with Boero 703 thinner, spread with a short hair roll) to the transom, to the false transom and to the daggerboard.


We then gave the cockpit the first coat of grey one part polyurethane paint to the cockpit sides, and added to that paint an anti-skid powder to coat the cockpit floor.

We're getting there!

Total work time to date: 765 hours



Saturday, May 15, 2021

Painting the vaka deck and cockpit (2)

 Two hours of work today to give the vaka a second coat of primer (Boero Giano, 8% thinned).

Total work time to date: 762 hours

Saturday, May 8, 2021

Painting the vaka deck and cockpit (1)

Three hours of work today to give the vaka deck and cockpit the first coat of primer. We first cleaned the dust with an anti-static cloth. We then used almost one liter of Boero Giano primer with 10% thinner (Boero 703) and we spread it with a short hair roller.



Total work time to date: 760 hours




Tuesday, May 4, 2021

Preparing the vaka deck for painting

Three hours bewteen saturday and monday to prepara the vaka deck and cockpit for painting. Last saturday we coated all the holes for the screws in the false transom and on the vaka deck with clear resin. We used pipe cleaners! 

Then yesterday we scrubbed all surfaces to be painted (deck and cockpit) using sanders with 240 grit.

We then put a plastic curtain all around the vaka hull to prevent paint drops from falling over the painted hull sides.

Total work time to date: 757 hours


Monday, April 26, 2021

Installing the portholes (1)

A couple of hours last saturday to bore the (many) bolt holes for attaching the hatches.

Vaka front deck

Vaka cockpit floor


Vaka aft deck

Ama decks

After coating the holes with clear epoxy resin we will spread silicone sealant on each opening and then screw down the hatch frames with SS bolts and nuts.

Total work time to date: 754 hours


Monday, April 12, 2021

Rudder blade installation (2)

After a lot of fiddling and measuring, last saturday we attached the rudder blade to the false transom by fixing the position of the gudgeons. 

Total work time to date: 752 hours


Saturday, April 3, 2021

Rudder blade installation (1)

Two hours of work to attach the pintles of the false transom. The rudder lifting mechanism is not trivial and requires quite a bit of measuring.

The false transom is hinged on the (real) transom and is lifted, when approaching a beach, using a rope passing behind the false transom to the aft deck of the vaka.

The rudder blade is quite heavy though... Hope it will work!

Total work time to date: 751 hours