Saturday, August 9, 2014

Disassembling the "flat out" table

At this point the flat out table, i.e. the very first thing we built, is no longer necessary so we disassembled it. The two ama hulls are still light enough to be lifted and moved around by the two of us without much effort. I would estimate a weight of 30-35 kg each. Here's your truly between the two hulls.


Next thing will be the construction of cradles to put the amas rightside up to glue up the deck.

Total work time to date: 150 hours