Saturday, September 13, 2014

Cradles done

2 more hours, and the cradles are done. I tested them under my not so light weight and they did not collapse. Anyway, here's a pic showing one of the amas rightside up.



The distance between the holes for the bolts turned out to be right on the spot, but there is indeed some twist in the hull (the top of the two bulkheads do not look not exactly parallel to each other.) Nothing alarming, but a bit disturbing. The building sequence does leave much space for such adjustements...

Total work time to date: 160 hours

No comments:

Post a Comment