Sunday, October 12, 2014

Ready to glue the deck

Just one hour today, to remove screws and clamps, grind epoxy runs, and draw the two 40 cm pads ready to be cut from 2 laminated layers of 1 cm plywood. I had to heat up several screws with the soldering iron to extract them.

Here's the first ama with the deck on, ready for glue. The 12 mm steel studs are clearly visible


And here is the 2 cm thick plywood sandwich with the two circular pads ready to be cut


The morning after (Oct. 13th) I had one spare hour so I camr to the shop to cut the two pads. The laminations looks perfect


And here is the ama with the pads on (not yet glued)


Total work time to date: 180 hours

No comments:

Post a Comment