Just one hour today, to remove screws and clamps, grind epoxy runs, and draw the two 40 cm pads ready to be cut from 2 laminated layers of 1 cm plywood. I had to heat up several screws with the soldering iron to extract them.
Here's the first ama with the deck on, ready for glue. The 12 mm steel studs are clearly visible
And here is the 2 cm thick plywood sandwich with the two circular pads ready to be cut
The morning after (Oct. 13th) I had one spare hour so I camr to the shop to cut the two pads. The laminations looks perfect
And here is the ama with the pads on (not yet glued)
Total work time to date: 180 hours
No comments:
Post a Comment