Monday, December 22, 2014

Fairing the deck edges (second ama)

We're just back from a business trip to San Francisco where we attended the American Geophysical Union Fall Assembly. Today I worked one hour to fair the deck edges of the second ama using mostly the power plane but also surforms and rasps. Here is how the second ama looks like now (after removing the sawdust all over the place)


We still have to fair the edges with sandpaper.

Total work time to date: 220 hours.

2 comments:

  1. Looks great! What is the thickness of the ply?

    ReplyDelete
    Replies
    1. Thanks! Thicknesses: deck 12 mm, sides 6 mm, bottom 10 mm, pads 20 mm

      Delete