Sunday, February 15, 2015

Vaka bulkhead: coating the other side

Three hours this week end. We gave a double coat of resin to the other side of the vaka bulkheads. We also cut the central floor panel to the sizes taken from the dry assembled hull, and cleaned one of the main hull sides from epoxy runs with the sander and 60 grit.


Here's a view of the two vaka bulkheads after the first coat. The holes are there to allow air circulation below the floor level. On the drawings though one of the two bulkheads actually does not show a hole, so we checked with John Marples, who said that the hole is "optional"...


Total work time to date: 250 hours.