Saturday, September 19, 2015

Main hull bottom planking (1)

Five hours of work today. We first faired the daggerboard trunk logs to match the bottom curvature. Here's the result after several passes of power plane, surform and sanding board and frequent checkings with a straightedge


We then roughly cut three pieces of 12 mm plywood for the bottom. Here they are in place to scribe the bottom outline


and here we are ready to cut the central bottom panel


In the picture above you can also see the two butt blocks to join the three pieces of the bottom planking. The final photo shows the two butt blocks being glued to the central bottom panel.


Total work time to date: 332 hours