Three hours to fiberglass one side of the first ama. We first sanded the side with 120 grit on the rotoorbital, in particular to feather the edge of the bottom fiberglass but also to take down drips and the like.
We then draped the 160 g/sq.m.FG on the side and cut it to size with scissors
and then wetted out the FG in place with about 600 grams of epoxy spread out with a roller.
Total work time to date: 438 hours
No comments:
Post a Comment