Two hours today to wash the two amas (floats) in order to remove the blush in preparation for an additional epoxy coat. We used a brush and a Scotchbrite pad with running water.
Here's a pic of the two amas before the shower
and here we are, properly dressed, doing the job
Total work time to date: 617 hours
You could not have done this here yesterday (or today!) at -7°C! Tried to clean Despina's car windows from the grit and even the windshield fluid was freezing as soon as it hit the glass, and I was INSIDE the building garage!
ReplyDelete