We started the installation of the false transom. It is a 18 mm thick triangular piece of plywood hinged on the real transom, to allow for an (hopefull) easy lift of the rudder. Today we installed the s.s. hinges on the real transom, visible in the photo below. When everything will be properly aligned, we will coat the holes with epoxy and then silicon sealant.
Total work time to date:747 hours
No comments:
Post a Comment