Saturday, August 14, 2021

Installing the hatches (2)

Two hours of work today to install the big square hatches on the vaka. We first spread caulk around the opening


and then attached the frame and the hatch using 5 mm S/S bolts and nuts. Here is the aft one open

 and closed.


Finally, a global view of the aka with both hatches installed, and the milestone beer.

Total work time to date: 777 hours