Now (16 April) we're ready to coat the last two panels. The problem with a trimaran is that one has three hulls to build :-). The last two panels are already on the table; on the left is the stack of the 4 panels wich have been already epoxy coated. The temperature dropped 10 degrees last night, so we should wait a couple of days for warmer weather...
Total work time to date: 98 hours
No comments:
Post a Comment