Four hours of work on sunday 14th. We first faired the fg edges on the second ama
We then temporarily rolled the vaka out of the shop to swap it with the amas
Both amas, now completely fiberglassed, have been put on the cradles, cleaned and set aside in the shop
We then cut the 160 g/sq.m. fg cloth to size, ready to be laminated on the vaka deck (next time). Here's it, with a fresh beer and the equally important mosquito repellent lotion.
Total work time to date: 469 hours
No comments:
Post a Comment