Saturday, January 20, 2018

Filling the weave on the amas

Three hours of work today to double coat with clear epoxy one side of both amas to fill the weave. We first rearranged the boat like in the pic below


Then we sanded the sides using 120 grit on both power sander and sanding board, to take down protrusions and runs. The, using a foam roller, gave a first epoxy coat before lunch and a second one aftwer 6 hours. Here's the final result.


Next week we'll do the other sides. Total work time to date: 620 hours

No comments:

Post a Comment