Three hours of work today to double coat with clear epoxy one side of both amas to fill the weave. We first rearranged the boat like in the pic below
Then we sanded the sides using 120 grit on both power sander and sanding board, to take down protrusions and runs. The, using a foam roller, gave a first epoxy coat before lunch and a second one aftwer 6 hours. Here's the final result.
Next week we'll do the other sides. Total work time to date: 620 hours
Saturday, January 20, 2018
Sunday, January 14, 2018
Washing the amas
Two hours today to wash the two amas (floats) in order to remove the blush in preparation for an additional epoxy coat. We used a brush and a Scotchbrite pad with running water.
Here's a pic of the two amas before the shower
and here we are, properly dressed, doing the job
Total work time to date: 617 hours
Here's a pic of the two amas before the shower
and here we are, properly dressed, doing the job
Total work time to date: 617 hours
Wednesday, January 3, 2018
Sanding
Happy New Year everybody! Two hours of unpleasant and hard work yesterday, to sand all aka pieces and deck seats smooth (sort of) in preparation for priming and painting. We used our roto-orbital sander with 60 and 120 grit, as well as hand pads.The lesson is clear: make sure not to have epoxy drips otherwise removing them afterwards is a real pain in the a%%.
Here's a pic of all aka segments
Total work time to date: 615 hours
Here's a pic of all aka segments
Total work time to date: 615 hours
Saturday, December 30, 2017
Filling the weave: akas (3)
One more hour today to complete the FG weave filling on the akas. 200 grams of clear resin were brushed on the glassed planks which had been previously cleaned to remove the blush. Today we did the top sides of the rear swing arms.
Total work time to date: 613 hours
Total work time to date: 613 hours
Wednesday, December 27, 2017
Filling the weave: the akas (2)
OMG, one more idle month. It's been a crazy end of the year: workload, conferences, family... So, even if we're late, Merry Christmas! We managed to work two hours this morning to sand smooth and fill the weave on the various aka segments, using about 400 g of clear resin.
Let's hope to be able to find some more time during the holidays.
Total work time to date: 611 hours
Let's hope to be able to find some more time during the holidays.
Total work time to date: 611 hours
Saturday, November 25, 2017
Filling the weave: akas
After more than one month here we are again... Two hours today to recoat the two akas and two of the fours swing arms with clear resin to fill the FG weave. We had previously washed the blush away.
We'll do this to all fiberglassed surfaces, and then we'll prime and paint.
Total work to date: 609 hours
We'll do this to all fiberglassed surfaces, and then we'll prime and paint.
Total work to date: 609 hours
Saturday, October 21, 2017
Washing the blush from the akas
We are back after one month... too many things to do. Anyway, just one hour this morning to scrub away the amine blush from the akas, which will be the firts pieces to be primed and painted. We used a brush and a Scotchbrite pad with running water.
We'll then power sand everything, fairing with putty where needed.
Total work time to date: 607 hours.
We'll then power sand everything, fairing with putty where needed.
Total work time to date: 607 hours.